UTICA BOILERS CuB Series Installation Manual

Browse online or download Installation Manual for Unknown UTICA BOILERS CuB Series. Utica Boilers CuB Series Operation and Installation Manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
CONTROL MODULE
REPLACEMENT KIT #550002965
INSTRUCTIONS
CHB-100, CHB-130 and CCB-150
P/N 240010533, Rev. A [07/2014]
Kit installation shall be completed by qualied agency.
Figure 1 - Control Housing Screw
WARNING
Fire, explosion, asphyxiation and electrical shock hazard.
Improper installation could result in death or serious injury.
Read this instruction and understand all requirements,
including requirements of authority having jurisdiction,
before beginning installation. Installation not complete until
appliance operation veried per Installation, Operation &
Maintenance Manual provided with boiler.
!
1.
Follow instructions TO TURN OFF GAS TO APPLIANCE
found in Installation, Operation & Maintenance Manual.
Verify all electrical power to boiler is turned off.
WARNING
Electrical shock hazard. Turn OFF electrical power supply at
service panel.
!
2.
Remove front jacket casing per instructions found in
Installation, Operation & Maintenance Manual.
WARNING
Burn hazard. Verify heat exchanger has cooled or use
appropriate personal protection equipment.
!
3.
Remove control housing screw on lower right of control
housing. See gure 1.
4.
Slide control housing forward, it will fold down on its
built in hinge. See gure 2
5.
Remove two back cover screws. Remove back cover.
See gure 2.
6.
Disconnect all wiring connectors on control board. See
gure 3.
7.
Remove 2 screws holding board in place. Slide board
out. See gure 3.
8.
Replace board with new board, screw board in place.
Connect wiring connectors on control board. See gure 3.
9.
Replace back cover.
10.
Fold control housing up and slide back into position.
Secure with control housing screw. See gure 1.
Figure 2 - Control Housing Folded Down on Hinge
Control Housing
Screw
Figure 3 - Screws Holding Board
Back Cover
Board Screws
Back Cover
Screws
Page view 0
1 2

Summary of Contents

Page 1 - CONTROL MODULE

CONTROL MODULE REPLACEMENT KIT #550002965INSTRUCTIONS CHB-100, CHB-130 and CCB-150 P/N 240010533, Rev. A [07/2014]Kit installation shall be completed

Page 2

11. Remove any call for heat or hot water.12. Turn gas and electric power ON.13. Power up boiler.14. Congure control for proper boiler size and type.

Comments to this Manuals

No comments