4.
Position top/front intermediate panel so back edge of top
hangs on adjustable clips on front of draft hood(s);
A. Left edge hangs on bracket on left upper jacket end
panel,
B. Right edge with integral bracket hangs on tie
rod(s).
See
Figure 17.
5.
Attach top/front intermediate panel to lower base
brackets through four slotted holes in panel. Use (4)
#10 x ½” screws. See Figure 18.
6.
On multiple base boilers, each additional top/front
intermediate panel attaches in same way (working your
way from left to right). Figure 18.
Figure 18
INSTALLATION – ASSEMBLY
Adjustable Clips
Bracket
Right Edge
Integral
Bracket
Front Jacket
Panel
Installed
Front Jacket Panel
Figure 17
Page view 17