24
Figure 31 shows end section and provided tappings.
Tappings are same in both right and left end sections.
OPENING SIZE STEAM
A 4” Supply and Return
B ½”
Primary LWCO and Gauge
Glass Set
C ¾” Drain, Left End
C ¾” Drain, Right End
D ½” Plugged
E 1” Accessories
*F 1” Safety Valve
G ¾”
Plugged or Electronic (Probe
Type) LWCO
*If using opening F for other than Safety Valve
or Safety Relief Valve, or Safety/Relief valve
is larger than 1”, Install Safety/Relief Valve in
Header Piping as near boiler as possible.
A
B
A
B
C
D
E
F
G
BOILER TRIM
Following controls are supplied as standard
equipment. Details of their function and operation
will be found in section on Checking and Adjustments
page 33.
STEAM TRIM
1.
Low Water Cut-Off (mounted externally) with blow-off
valve
2.
High Pressure Limit Control
3.
Pressure Gauge
4.
Water Gauge Glass Set
5.
Siphon Loop
6.
Safety Valve 15 psi. See page 27 for installation location.
STEAM TRIM ASSEMBLY
Field assemble Steam Trim, Low Water Cut-Off, High
Pressure Limit Control, Pressure Gauge, Water Gauge
Glass Set and Siphon Loop, as shown in Figure 32.
See Figure 31 and Chart above for location of
controls.
WATER LEVEL
29” TO FLOOR
TAPPINGS
Figure 31
Figure 32
NOTICE
Do not place any shutoff between pressure relief
valve and boiler, or on discharge pipes between
such safety valves and atmosphere. Installation of
pressure relief valve shall conform to requirements
of ANSI/ASME Boiler and Pressure Vessel Code,
Section IV.
Field Assembled